Read

 

 

 

 

Brochure English – Folleto Español

  • General overview about BAMTEC Reinforcement Technology – the fastest rebar solution
  • Descripción general sobre la tecnología de armadura BAMTEC: la solución de armadura mas rapida

 

BAMTEC Report 2017

  • Building of new School for 4700 students. 25’000 square meters, worth 70 mio. EUROS. BAMTEC reduces time of shell construction.
  • In-situ concrete walls with BAMTEC Wall: Compared to mesh 20 % savings in material and 70 % in time.

 

 

 

 

 

BAMTEC Report 2016

  • Extension of the G7 Summit-Hotel “Schloss Elmau” in Germany
  • BAMTEC Wall: the new lifting tool to reinforce walls easy and fast

 

 

 

 

 

 

BAMTEC Report 2015

  • Fast construction of one of the most modern hospitals in France
  • BAMTEC RED – reach higher productivity with reduction

 

 

 

 

 

BAMTEC Report 2013 (English / Español)

  • BAMTEC as a basis for one of the most ecological office buildings in the world
  • Simple solution for reinforcement work in times of acute labor shortage

 

 

 

 

 

 

BAMTEC Report 09/2011 (English / Español)

  • Efficient construction of a soccer stadium with shopping center

 

 

 

 

 

 

BAMTEC Report 04/2011 (English / Español)

  • Groundbreaking extension of University of Turin (Italy)
  • Cost savings with BAMTEC on high rise construction

 

 

 

 

 

 

BAMTEC Report 2009

  • Health Care: Fourth Valley Hospital in the UK – 21 % cost savings thanks to BAMTEC
 
>> Ask for more case studies using the contact form below <<